Beige woven fabric, partly rolled, showing its edge and weave
PU Coated fiberglass fabric

PU Coated Fiberglass Fabric

Lightweight coated protection, specified by application.

Specifications

Coating
PU (polyurethane)
Base fabric
E-glass 430 g/m² (3732), 1650 g/m² (3788) or equivalent
Finished weight
200–1500 g/m²
Thickness
0.3–2.0 mm
Width
1000 / 1200 / 1500 / 2000 mm
Color
Silver-grey, black, custom
Packing
Roll in carton or woven bag

PU Coated Fiberglass Fabric

Polyurethane coated fiberglass fabric for premier insulation and fire protection. Base fabrics such as E-glass 430 g/m² (style 3732) and 1650 g/m² (style 3788); finished weights 200–1500 g/m², thickness 0.3–2.0 mm, widths 1000 / 1200 / 1500 / 2000 mm, in silver-grey, black or custom colors.

Choose by Application

Thermal Insulation

PU coated fabric serves industrial thermal insulation duties where a flexible coated surface is needed.

Fire Protection

The coating adds a protective layer over the fiberglass base for fire-protection covers.

Smoke Curtain

PU coated fabric is a candidate construction for smoke curtains — the final choice follows the customer's test standard. Send us your standard and we propose the coating.

Before Quotation, Please Confirm

Confirming these ten points with us speeds up an accurate quotation and avoids later specification disputes:
1. Application (where and how the fabric will be used)
2. Base fabric (e.g. E-glass style 3732 at 430 g/m², or style 3788 at 1650 g/m²)
3. Finished weight (g/m², coating included)
4. Thickness (mm)
5. Coating type (silicone / PU / acrylic / vermiculite)
6. Single-sided or double-sided coating
7. Width (1000 / 1200 / 1500 / 2000 mm, or custom)
8. Roll length
9. Color
10. Required standard or test report (e.g. EN 1869, UL 94)

Packaging & Certification

Roll packing in cartons or woven bags.
Certificates and test reports are arranged on request.
Trial orders, custom specifications and mixed product orders are welcome. Send us your application and target specification, and the VETEX team will come back with a recommended construction within one working day.